K. Time to branch off to the other side of this T-junction, for the next building.

Rough layout, much like last time.

Machines laid out.

Pathing laid out for some Crude Oil.

Forgot that some of the machines are actually for Diluted Fuel production, and had to rebuild them with Packagers and canister loops.

All Water Extractors built, with piping fully laid out.

Same for Crude Oil.

    • JakenVeina@lemm.eeOP
      link
      fedilink
      arrow-up
      1
      ·
      20 days ago

      Honestly? Cosmetics. It really shouldn’t be necessary. Just felt like trying it, a lot of people swear by the technique.